Our prof from school a couple weeks ago asked us this problem. Basically it's our Netware 5 course and we pretty much have learned everything so we had some extra time. He posed us this question. Company Acme HQ'ed in Chicago has 2,000 users (on one network) and has affiliate offices in Milwaukee, New York and London. NY has 150 users, Milwaukee has 250 users and London has 50. There are dedicated T1 lines going from all domestic locations to Chicago and a 384 frame relay going from London to Chicago. The network in Chicago is running NW3 and 10baseT with no internet access at all and running, let's say cc:Mail. What upgrades would you make? This is a list we have come up with so far (ripped shamelessly from one of my partners email cause I have a hangover):
Because no one from our group except for me (slackers) was there for last class, we get to do our presentation on the 30th. I'm sure I'm leaving things out so I'll forward it to my group as well so they can check in and hopefully join our little Xi family.
- Upgrade to NW5 from NW3 because NW5 is more efficient: hierachacal not bindery.
- Be sure to purchase NW5 licenses to avoid hefty fines.
- Upgrade from 10 base T to 100 base for speed & future expansion.
- Replicate so that each location has it's partition locally as well as replicas of the other locations.
- Impliment enteprise level ISP: Worldcom frame relay internet gateway adds connectivity without additional circuits.
- Break down Chicago into 4 networks with the purchase of 3 routers to make traffice more managable.
Because no one from our group except for me (slackers) was there for last class, we get to do our presentation on the 30th. I'm sure I'm leaving things out so I'll forward it to my group as well so they can check in and hopefully join our little Xi family.